A website redesign is one of the few projects that can quietly destroy years of accumulated SEO value in a single afternoon, and most of the ways it happens are boring: a forgotten redirect map, a staging noindex tag that ships to production, a form that posts to nowhere. The fix is sequence. Here are the 28 steps in the order we run them on every project.
Phase 1: Before anyone designs anything
- Write down why you’re redesigning. ‘It looks dated’ is valid but vague; ‘demo requests flatlined’ is a target. The goal defines every later decision.
- Benchmark current performance: traffic, top landing pages, conversion rates, rankings, Core Web Vitals. Without a before, nobody can prove the redesign worked.
- Crawl the full site (Screaming Frog or similar): every URL, title, meta description. This inventory becomes your redirect map and QA checklist.
- Identify the pages that earn traffic and links. These pages are load-bearing walls: they get preserved or carefully redirected, never casually dropped.
- Interview whoever talks to customers. Sales and support know what visitors don’t understand about the current site better than any analytics view.
- Define the content plan. New copy or migrated? Who writes it, and by when? Content is the #1 cause of redesign delays. Decide before design starts.
- Set the performance budget in the contract: target PageSpeed scores on mobile, in writing.
Phase 2: Design and build
- Design mobile-first: most traffic is mobile and Google ranks the mobile version.
- Build on staging, always. Nothing gets developed on the live site.
- Keep URL structure unless there’s a reason to change it. Every changed URL is redirect work and temporary ranking risk. Change URLs for strategy, not tidiness.
- Build the redirect map as URLs change: old URL to new URL, one row each, no wildcards you haven’t tested.
- Carry over metadata deliberately: titles and descriptions from the crawl inventory, improved where weak, not regenerated from scratch.
- Preserve heading structure on rebuilt pages: one h1, logical h2/h3 order. Builders make it easy to get this wrong.
- Implement schema markup: Organization, LocalBusiness, or product schema as fits, plus breadcrumbs.
- Optimize every image on the way in: WebP, sized to the container, lazy-loaded below the fold. Retrofitting later never happens.
- Rebuild forms and test their destinations: where do submissions go, who gets notified, does the CRM receive them?
Phase 3: Pre-launch QA (the disaster-prevention phase)
- Click every nav item and footer link on staging. All of them.
- Submit every form and confirm the email/CRM arrival, not just the thank-you page.
- Test on real phones, not just the browser’s responsive mode.
- Run PageSpeed on the key templates and hold them against the budget from step 7.
- Verify analytics and conversion tracking fire on staging (in debug mode) so measurement survives the switch.
- Load and verify the redirect map on staging: spot-check the top 50 URLs from your crawl.
- Check the robots meta: a staging noindex tag that ships to production is a classic miss, and nothing warns you until pages drop out of Google.
Website launch checklist for the day you switch
Phase 3 tests the new site on staging. This list is for the switch itself, the step in the website redesign process where a missed setting goes public within minutes.
- Back up the old site, files and database, even if you never plan to roll back.
- Switch payments and email to live: gateway keys, transactional email, and form notifications that pointed at a test inbox.
- Clear every cache (plugin, server, CDN) so visitors don’t get a mix of old and new pages.
- Make sure one version of the domain loads over HTTPS and every other version redirects to it.
- Run one real transaction end to end: a form, an order or a booking, all the way into the inbox or CRM.
- Keep a developer on call for the rest of the day.
On our redesign projects we test across browsers and devices before launch and monitor the site for 72 hours once it is live. Mindset Conference had no room for a second try. It launched under a new name with the event date already fixed, and every ticket sold had to arrive by email as a QR code that scans at the door. We tested the purchase, the email, the database record and the scan as one chain, and our team was on site on event day to support check-in. The Mindset Conference case study shows how the site and the ticketing went live in 2 weeks.
Phase 4: Launch and the two weeks after
- Launch midweek, in the morning, never Friday. You want business hours and a full team between you and the weekend.
- Immediately after switch: spot-check redirects on production, submit the new sitemap in Search Console, run a fresh crawl for 404s.
- Watch Search Console daily for two weeks: indexing errors, 404 spikes, and Core Web Vitals flags show up here first.
- Compare analytics week-over-week against the benchmark from step 2. Small ranking wobble is normal for a few weeks; cratering traffic means a missed redirect or indexing issue that needs finding today.
- Schedule the 30-day review: conversions vs. benchmark, Core Web Vitals field data, and the punch list of small fixes that surfaced. A redesign ends here, not at launch.
The pattern behind every step: Notice how little of this list is about design. Redesigns fail on process (inventory, redirects, QA, measurement), which is why ‘we know a good designer’ isn’t the same as ‘we’re safe.’ Our redesign projects run this exact sequence, and step 2’s benchmark is how clients hold us accountable afterward.
Planning a redesign?
Send us your current site. We’ll benchmark it, flag the SEO risks specific to your situation, and quote the redesign fixed-price with performance targets in the contract.

















